- Crank shaft deflection should be taken and recorded.
- Crank case oil should be removed and sump be cleaned.
- Crank case inspection should be done so that nothing is left inside.
- Make sure all the parts are fitted and tightened as per the manual.
- All the isolated systems are put back into operation one by one, starting from the fresh water system. Leaks should be checked thoroughly.
- Fresh oil should be taken and lube oil system should be put back in use followed by fuel oil system.
- Turning gear should be rotated by tommy bar to ensure free movement of crank shaft
checks which must be performed
Lube oil checks
- Sump lube oil level
- Governor lube oil level
- Rocker arm lube oil level
- Alternator forward and aft bearing lube oil level
- Lube oil in turbine & blower side of turbo charger
Temperature checks
- Exhaust gas temperature
- Turbocharger (inlet-outlet) temperature
- Booster air inlet temperature
Cooler temperatures
- Cooling sea water (inlet – out let) temperature in cooler
- Jacket cooling water (inlet – outlet) temperature
- Air cooler (inlet -outlet) temperature
Procedure of running generator after O/h
- Open the indicator cock
- Prime the lube oil to all parts by hand pump or by motor driven priming pump
- Ensure that all jacket cooler valves, lube oil cooler valves, air cooler valves should be in open position
- With use of the Turning bar turn the fly wheel and check for any resistance on the bottom end bearing and check any water / fuel coming out through indicator cocks
- While turning engine, check all visible lube oil points are lubricated
- Remove the turning bar from fly wheel and put in the place
- Drain the auxiliary air bottle
- Blow through engine, In order to ensure that no water is inside combustion chamber if it is present it may cause water hammering
- Close the indicator cocks and pull lever from stop to start
- The engine will run on fuel oil once the generator picks up the rated speed.
- Run generator on Half speed, adjust via governer, for 10 sec, Check the crankcase
- Run for 30sec, 1 min, 3min, 5min and check crankcase respectively
- No load run for 10 minutes to warm the engine up, check all parameters
- Put generator on load by closing air circuit breaker
- In order to synchronize the incoming generator with running generator syncroscope method/dark lamp method is used
-