-
icedcappucino started the topic ISPS CODE in the forum Maritime Law 4 years, 5 months ago
WHAT IS ISPS CODE
– intro
– reference SOLAS
– application
– part a/part b– SSP
– DOS
– drills
– SSAS
– SSO
– ISSC
– access to the ship
– restricted areas
– detailed provisions for diff. security levels -
icedcappucino started the topic DRY DOCK SURVEY in the forum Ship Construction & Drydocking 4 years, 5 months ago
DOCKING SURVEY ITEMS
SOLAS I/10
Ship’s bottom inspection and duration■ Bottom/Docking Survey:
■ Two ‘Docking Surveys’ are required to be completed within any 5 year survey cycle.
■ Max period between two successive dockings not to exceed 36 months and one must coincide with Special Survey.
The ‘Intermediate Docking Survey’ may b…[Read more] -
icedcappucino replied to the topic MOORING AND ANCHOR OPERATION in the forum Navigation 4 years, 5 months ago
BALTIC MOOR
– ports with strong onshore winds
– wind on beam or abaft the beam
– stern WIRE attached with twine in bights to fwd anchor
– secure mooring lines, take weight on anchor and stern wire
– disadvantage is take taken to secure and let go stern wire to anchor
– find lee if necessaryMediterranean moor
– less quay space
– can discharge…[Read more] -
icedcappucino started the topic Loading heavy lift in the forum Cargo Work 4 years, 5 months ago
PREPARATION
– as per CSS/ CSM/ SOLAS ch. VI/2– info from shipper (mass, dimensions, cog/diag, securing points, bedding, lifting points)
– capacity plan, stability booklet, load density, visibility, working spaces
– loading instrument, check stability diff conditions. Run simulation. GM, SF, BM, TF, visibility, FSE
– lashing, msl, dunnage, strong…[Read more] -
icedcappucino started the topic Loading timber in the forum Cargo Work 4 years, 5 months ago
How to load Logs? Everyhting about timber code, stability requirements, loading, lashing, why & how? Visibility criteria
Timber is by volume
SHIP – Dimension of cargo spaces. (Length, Breadth, Depth)/ cubic bale capacity
CARGO – / length of logs/ cubic volume
– capacity of gear used
– absorption of water
UNDER DECK
– Load density of the tank…[Read more] -
icedcappucino started the topic Passage Planning in the forum Compass 4 years, 5 months ago
SC 16 of 2010
Execution means execution in accordance with passage plan
Factors for executing and deviating from plan
.1 the reliability and condition of the vessel’s navigational equipment;
.2 estimated times of arrival at critical points for tide heights and flow;
.3 meteorological conditions, (particularly in areas known to be affected by…[Read more] -
icedcappucino replied to the topic MOORING AND ANCHOR OPERATION in the forum Navigation 4 years, 5 months ago
All 3 stoppers and requirements he asked each and everything in stoppers ?
Diagrams – DJ house
Mooring ropes will use a rope stopper, either the ‘common rope stopper’ or the ‘West Country stopper’, depending on the type of lay and the material of manufacture of the mooring ropes in question.
– Same on same except for nylon
– flexible, high me…[Read more] -
icedcappucino started the topic SCBA in the forum SOLAS 4 years, 5 months ago
SCBA test and requirements ?
Visual Checks, content test, leak test, low level alarm, gas tightness, positive pressure test
1) Visual checks: Check condition of mask (facepiece, head harness & lens for cuts, scratches, missing buckles), backpack (straps & buckles for cuts, tears), cylinder (dents, gouges), hoses (cuts, cracks, bulges), SSD…[Read more] -
icedcappucino started the topic SWL, PROOF LOAD AND MSL in the forum SOLAS 4 years, 5 months ago
Swl The safe working load (SWL) of a lifting appliance is the maximum mass which may be lifted vertically by this appliance
Proof Load
It is the excessive load applied on lifting appliance during testing, without exceeding its elastic limit, in presence of competent authority.
MSL stands for maximum securing load. It is a term used to define the…[Read more] -
icedcappucino started the topic FIXED CO2 SYSTEM in the forum SOLAS 4 years, 5 months ago
MONTHLY
– valves
– releasing controls accessible for use
– no damages
– cylinders secured
– alarm devices in placeANNUAL
– no structural modifications
– damage or rusting
– piping system, damage loose support, corrosion
– nozzles unobstructed
– flexible hoses tightened
– warning and evacuation signsINTERMEDIATE/ PERIODICAL/ RENEWAL
– 90% of…[Read more] -
icedcappucino started the topic MOORING AND ANCHOR OPERATION in the forum Navigation 4 years, 5 months ago
Gave a stage and asked to rig it. Then asked about all 3 stoppers. Limitation of west country stopper. Why chain stopper is against the lay? Why 25 cm
Limitation of west country
Never use nylon on nylon or on wiresBOSUN’S CHAIR – PRECAUTIONS AS PER COSWP
– check all gear visually, change if required
– test with atleast 4 times the weight r…[Read more] -
icedcappucino started the topic BULK CARGO in the forum Cargo Work 4 years, 5 months ago
How BLU code will assist u in loading.
BLU Code (Code of Practice for the Safe Loading and Unloading of Bulk Carriers) Ed
2011
1) BLU Code including BLU Manual contains the Code of Practice for the Safe Loading and Unloading of Bulk Carriers, 2) BLU Code is for ship 3) BUL manual for terminal representatives
Section 1 – Definitions
Section 2 -…[Read more] -
icedcappucino started the topic GRAIN CODE in the forum Cargo Work 4 years, 5 months ago
What do you know about international grain code? What are the stability criteria for grain ship?
This replaced the original chapter VI of SOLAS, which contained detailed regulations on the carriage of grain in bulk, with more general requirements and placed the detailed provisions on grain in a separate mandatory code.
Applies to all ships…[Read more] -
icedcappucino started the topic COC 5 (Engine) Oral Questions in the forum COC (Engine) past oral questions 4 years, 6 months ago
Masterlist
JULY 2017 Hussein
1) Taking over watch
2) bottom platform checks
3) crankcase inspection
4) one unit exhaust temperature high(with cross questions)
5) ows working and operation, compressor long running with cross questions
6) blackout action
7) how will u know purifier not running efficiently
8) L.O purifier overhaul
9) scavenge…[Read more] -
icedcappucino started the topic FURTHER STUDIES in the forum icedcappucino 4 years, 6 months ago
-
icedcappucino started the topic COC 1 (Engine) Oral Questions in the forum COC (Engine) past oral questions 4 years, 6 months ago
MASTERLIST OF COC 1 ORAL QUESTIONS
Date is not known unless otherwise stated.
Hussein
1. Stern tube system and tail shaft survey
2. 4 ram steering gear (troubleshooting and emergency steering)
3. One unit high exhaust gas temperature
4. ECA change over
5. ERM
6. High Voltage Management
7. Jacket CW system control
8. SEEMP, EEDI, EEOI
9. Both…[Read more] -
icedcappucino replied to the topic IMO 2020 & Scrubber technology in the forum Marine Legislation 4 years, 7 months ago
IMO 2020 SHIP IMPLEMENTATION PLAN
1) Risk assessment and mitigation plan (impact of new fuels)
– Capability of fuel injection pumps, boiler, purifier = Verify machinery performance on new fuel oil. If needed, change machinery components
– Compatibility of different fuels during bunker or changeover = Carry out test and segregate different fuels
-…[Read more] -
icedcappucino started the topic Master list of Main Engine videos in the forum Main & Aux Engine 4 years, 7 months ago
HYDRAULIC TOOLS
——————————————————————————————————-
FUEL INJECTION PUMP
-
icedcappucino replied to the topic Liner, wear & material in the forum Main & Aux Engine 4 years, 7 months ago
Liner surface: It looks like a fine finish, but on a microscopic scale it is undulating to allow for rapid running-in and to provide a key for L.O which carries away metal particles from running-in process.
The process of honing rectifies the shape of the liner, returning it to circular shape, it also removes scuffed areas and restores the…[Read more]
-
icedcappucino replied to the topic Tie rod, Material & tightening procedure in the forum Main & Aux Engine 4 years, 7 months ago
If tie bolt is broken, it must be immediately replaced.
- Load More