Admin started the topic Boiler repeated flame failure actions in the forum Boilers 6 years, 1 month ago
Possible causes:
-
-
-
- Flame eye dirty
- Pilot burner. ( DO tank empty, do pump not working, nozzle choked, igniter electrode> no voltage, position wrong, fouled or gap too much)
- Air/ fuel ratio incorrect
- Air fuel ratio adjusting linkage incorrect
- ACC failure
-
-
Main burner
- Valve shut
- Filter cho…
-
-
Admin started the topic Types of boiler burners in the forum Boilers 6 years, 1 month ago
Turn down ratio indicates the flexibility of burner to cope with different loads without losing efficiency.
TRD = fuel consumption at max load/ fuel consumption at minimum load.
Pressure jet burner TDR 3:1
Rotary cup TDR 15:1
Steam blast TDR 20:1
Ultrasonic TDR 15:1
- Simple pressure jet burner
Atomization of f…[Read more]
-
Admin started the topic Boiler combustion controller ( ACC) in the forum Boilers 6 years, 1 month ago
- Combustion control system correct the proportion the quantities of air and fuel being burnt.
- Ensure complete combustion
- The system measure the flow rates of fuel oil and air in order to correctly regulate their proportions.
- Two control elements are used, ‘steam flow’ and ‘steam pressure’.
- The steam pressure signal is fed to a c…
-
Admin started the topic Boiler safety valve setting in the forum Boilers 6 years, 1 month ago
Difference between a safety valve and a relief valve
- Relief valve:
The higher the pressure, the more the valve disc lifts off its seat. Relieving capacity increases with over-pressurization increase.
- Safety valve:
Designed to stay completely closed until the popping pressure is reached. At popping point the valve lifts sharply a…[Read more]
-
Admin started the topic Tie rod, Material & tightening procedure in the forum Main & Aux Engine 6 years, 1 month ago
Fitting of new tie rod
- The lower nut of tie rod is screwed on
- Clean the seating surface of intermediate ring and upper nut
- Screw ring screw on tie rod and lift till the lower tie rod rest against the bearing shield
- Tighten the upper tie rod nut with tommy bar until seated firmly, then remove ring screw
Tightening Seq…[Read more]
-
Admin started the topic Turbocharger L & M, surging, how to minimise & sealing arrangment in the forum Main & Aux Engine 6 years, 1 month ago
L & M
K = It is the distance between the compressor end cover mounting face and shaft end .Mark it as K.
Pull the rotor shaft towards the compressor side until the impeller comes in contact with the insert and determine K2.
Impeller clearance L = K – K2
Thrust the rotor shaft towards the turbine side until the turbine disc and…[Read more]
-
cat60y started the topic Cargo hold inspection in the forum Ship Construction & Drydocking 6 years, 1 month ago
The Chief Officer must always carry out a full and final inspection of all cargo holds before presenting them for shipper’s final approval and acceptance, to ensure that all cleaning work has been carried out as per his instructions and to his satisfaction, and that he is satisfied that the cargo holds are in a suitable condition for the carriage…[Read more]
-
cat60y started the topic Preparations for drydock & drydock survey in the forum Ship Construction & Drydocking 6 years, 1 month ago
Preparations before Dry-docking
- Prepare Repair Specifications in advance for budgeting and inviting quotations
- Pipe Lines
- Structural steel renewal, for which plate thickness gauging may be required.
- Overhauling of Mooring Equipment.
- Special servicing requirements
- Overhauling and testing of Cargo Gear ( cargo pumps if the vessel…
-
cat60y started the topic Cold ironing / alternative marine power (AMP) in the forum Ship Construction & Drydocking 6 years, 1 month ago
Preparation and checks before drydock for receiving shore power:
A chief engineer to ensure the following checks are made to ensure safe operation.ship’s electrical engineer will prepare the ship’s power receiving terminal box and should do following things:
- Ensure the receiving box is not obstructed with any object, pipes or spares. It…
-
cat60y started the topic Main engine bearing survey in the forum Ship Construction & Drydocking 6 years, 1 month ago
The ship’s main engine comprises of several bearings, which assist the moving parts such as crankshaft, connecting rod, crosshead etc. The bearings supports the journal pin to avoid metal to metal contact, to reduce the rotational friction, and to transfer the load through lubricants.
Main engine bearings are opened up for inspection or r…[Read more]
-
cat60y started the topic In water survey (UWILD) underwater in lieu drydock in the forum Ship Construction & Drydocking 6 years, 1 month ago
The purpose is to inspect ship hull of damage, any organic build up in lieu to dry dock inspection
In water survey can find weld cracks prior to painting
In water survey to save time during dry dock
Requirement for inwater survey
-
- Calm weather
- Warm seawater
- At anchorage
- Enough draft, watier surface
- Ship at e…
-
-
cat60y started the topic Tailshaft survey in the forum Ship Construction & Drydocking 6 years, 1 month ago
Scope of tail shaft survey
Propeller to be withdrawn for inspection
-
-
- Visual inspection
- Crack detection test
- Check threads for damage
- Check tapered cone for roughness
- Scoring on liner
- Check bearing face and white metal
- Measurement of tailshaft external diameter to measure wear down.
- Stern tube analysis r…
-
-
-
cat60y started the topic IMO 2020 & Scrubber technology in the forum Marine Legislation 6 years, 1 month ago
https://www.youtube.com/watch?v=x7KjSLYmvJM&t=25s
1) Oct 2016 imo decide the sulphur limit (sox) under marpol VI of 0.5%m/m enter force on jan2020
2) Ships operating within emission control area shall not exceed 0.1%m/m on or after jan2015
3) Under the marpol amendments
- Ship shall not use non-compliant fuel oil by jan 2020, and s…
-
cat60y started the topic Port state control checklist in the forum Marine Legislation 6 years, 1 month ago
https://www.youtube.com/watch?v=vvVzBJ952E4“>Heres an interesting video from Mothership about Flag state control
What is the first impression of the ship upon going up the gangway. Are the security measures in place? This will be the observation for ISPS.1) Master’s office; Certificates and documents
Inspection starts at master’s office to con…[Read more]
-
cat60y started the topic Ballast water management plan & treatment plant in the forum Marine Legislation 6 years, 1 month ago
https://www.youtube.com/watch?v=9g89KEbYd6I
Contents of Ballast Water Management Plan- Reduce the harmful effects on the marine environment spread by invasive aquatic microorganisms transferred from one area to another through ballasting operations.
- (IMO) adopted a convention in order to control and manage ships ballast and sediments on on…
-
cat60y started the topic Statutory certificates & list of classification society(Recognised Organisation) in the forum Marine Legislation 6 years, 1 month ago
https://drive.google.com/file/d/1Z_j6H1MblkxEdvYD-QZb6XL3ooYSB8EN/view?usp=sharing“>Class Nk portstate control checklist
Statutory certificates.Certificates as required by law for the ship to sail ,
window period +- 3 months, certs must be original, if have supplement certs, must be present.
MARPOL- International oil pollution pr…
-
cat60y started the topic International ship port facility security (ISPS) in the forum Marine Legislation 6 years, 1 month ago
https://www.youtube.com/watch?v=jsj0gT4jae4
The International Ship and Port Facility Security (ISPS) Code is an amendment to the Safety of Life at Sea (SOLAS) chapter 11 after Sept 11 2001 terrorist attack.
ISPS requires vessels to have a ship security plan. Prepared by Company security officer (CSO),Ship security assessment regularly…[Read more]
-
cat60y started the topic Checks & regulation on life saving appliances (LSA) & Firefighting appliances (FFA) in the forum Ship Construction & Drydocking 6 years, 1 month ago
LSA:
1) General requirements
- To be of proper workmanship and materials, Corrosion resistant, against seawater, sunlight, oil or fungal.
- Be of highly visible color and to be fitted with reflective material, assist in detection.
- Clearly marked with approval information ,and with clear instructions
LSA into 3 categories, general,…[Read more]
-
Admin started the topic SOLAS requirement for UMS in the forum Marine Legislation 6 years, 1 month ago
Solas Requirement for UMS
SOLAS 1974 Chapter II-1, regulations 46 to regulation 53.
1) Protection against fire
a) Arrangement should be provided on UMS ship to detect and give alarm in case of fire.
b) In the boiler air supply casing and uptake.
c) In scavenge space of propulsion machinery.…[Read more]
-
Admin started the topic Load line survey in the forum Ship Construction & Drydocking 6 years, 1 month ago
Load line survey
In order detecting whether the vessel is over-loaded and it’s freeboard,
it is basically an effort to make the hull watertight below the freeboard and weather tight above it.
It is a administration requirement for ships to get Load line certificate which is subjected to annual survey.
- 150 GRT and above
- New sh…